Hundreds of water-holes and hand pumps have been installed, mainly in the centre of villages, to ensure that more families have access and can benefit from these hand pumps.
Ehsaas has installed over 4,600 Water Pumps and 147 Water Wells to date.
Small Hand Pump – £150
These pumps are typically installed within 9 to 10 months of receiving the donation, or sooner, depending on the assessments carried out by our surveyors. They evaluate the location and feasibility before commencing the installation. Each pump provides water to approximately 300+ beneficiaries daily and is installed in remote, isolated areas. The depth of these pumps ranges from 90 to 120 feet.
Large Hand Pump – £395
These pumps are usually installed within 9 to 10 months of receiving the donation, or sooner, subject to site assessments by our surveyors. The location and feasibility are carefully evaluated prior to installation. Each pump can provide water to approximately 400+ beneficiaries daily and is specifically designed for isolated regions. The depth of these pumps ranges from 200 to 250 feet.